Re: Suzy? [message #461 is a reply to message #460] |
Wed, 19 May 2004 17:12 |
Manualblock
Messages: 4973 Registered: May 2009
|
Illuminati (13th Degree) |
|
|
Your absolutely right, unfortunately short delay as the wife; for some reason, decided she needed a new bathroom and am now finishing the tile work as of this week. The rip-out took longer than expected since the sub-floor ended up being the thickness of cardboard and leaked through the joists, many stories with this one but I do a little on the amp when I can. I needed to lengthen all the wires from the transformer so that took lots of solder and stripping now I am wireing the switches and then test. The PC looks good so hopefully all will power up nice. Thanks for asking. J.R.
|
|
|