custom PT thoughts..

[ GroupBuild Forum ] [ Help ]

Posted by Tnuctipun [ 172.132.251.57 ] on January 14, 2005 at 20:26:25:

In Reply to: Re: between a week and two.... posted by manualblock on January 14, 2005 at 19:21:45:

lets take a look at possible construction methods. There will be convenient places to put the taps on the HV winding. It depends on number of turns, so as to arrive at a tap point which is at the end/beginning of a layer.

It may be better to divide up the voltage a bit diferently. The insulation will be better protected if we don't drag a lead across other turns.

I will contact Phil at Heyboer and see what he can do for us and how much it will cost. I will do the footwork on behalf of the group, as I have been dealing with them for a while.
regards,
Douglas