Re: Guinevere and the 12B4

[ GroupBuild Forum ] [ Help ]

Posted by Tnuctipun [ 205.188.116.69 ] on June 01, 2005 at 05:45:54:

In Reply to: Guinevere posted by Cheetah on May 31, 2005 at 13:04:13:

I'd put only a minimum of 5 mA and a max of 25 mA based on the LED biasing scheme. I suggest more. Like 24.5 mA( or what ever the diodes and your PS are comfortable with ).

Going above 25 mA is going to make the turn-on conditions a bit more critical with the VR tubes. They can stand nearly 100 mA for a short period. Say, 20 mA for the VR string, and 20 each for the 12B4's and that is 60 mA at start going through the VR tubes. NO PROBLEM!

I am running 21-22 mA with the current 12B4 linestage and didn't see improvement above 25 when I tried it..
regards,
Douglas


Replies:



[ GroupBuild Forum ] [ Help ]